Monday, October 8, 2007

Week 23 (10/1 - 10/7)

Second coat of stucco (brown coat) was applied, looks really good. Drywall was sprayed with preparation coat, and is ready for texture.

Worked on drainage pipes, a little drywall, insulation downstairs, clean up, landscape lighting pipes for the front, installed pipes under driveway.

We went an ordered our wood flooring. Hopefully we will make good progress in October.

MC












Thursday, September 27, 2007

Week 19 - 22 (9/1 - 9/30)

Week 19 - Stucco Lath, Rough Plumbing, HVAC, and Electrical, misc. framing punch list stuff. I ran all of the low voltage communications cabling and tv cabling this weekend.

Week 20 - Fireplace installed, Lath for Stucco completed. Inspections completed with a small list of corrections (20 or so).


Week 21 - Corrections made, Insulation completed. Drywall started. Michele hung insulation on all interior walls, and we rented a trencher and put in french drains and irrigation trenches.

Week 22 - Drywall (Sheetrock) complete, inspected, stucco scratch coat completed. Tape and texture will start.

Things are going well, Michele is doing a bunch of selection and ordering of kitchen cabinets, appliances, tile, etc. This weekend we should be completing our french drains and irrigation pipes.

MC