Week 7 - We have Power!

PG&E came out on Monday to set our meter. We now have power to the property. Framing is complete in the basement. Framing continues on the main floor. I added a few more photos to week 6 from the end of the week.



Last weekend we went camping on our annual Bullards Bar camping trip, to see pictures click on the Jam On link to the right. While we were at Bullards Bar our camera was returned to us by our friend Annie, who picked it up at Pioneer Day.



MC

Friday, June 1, 2007

Week 5 - Framing

This week the basement area was filled in with rock, sand, wire and the concrete slab was poured. Framing was started on the left side of the house and began on the right side after the slab was poured. This weekend we have to take out a large pine tree that is to close to the back left corner of the house.
MC





Update: Framers made good progress on Friday, so added a few more pictures. Mom and Dad helped take down the trees that needed to be removed on Saturday, and on Sunday I dug some more trenches and Mountain Mike started laying electrical pipe.