Week 25 (10/15 - 10/21)
Week 25
stucco foam build outs completed
continue spraying primer, painted garage
garage door installed
gas tank set
stucco foam build outs completed
continue spraying primer, painted garage
garage door installed
gas tank set
Week 24 (10/8 - 10/14)
Week 24
stucco foam build outs started
imperfect smooth texture was completed by Ruben with Sierra Wes Drywall
We started spraying the walls with primer/sealer
finished some french drains
spread 6 yards of mulch around the house to keep mud down
ordered interior doors
gas line installed
stucco foam build outs started
imperfect smooth texture was completed by Ruben with Sierra Wes Drywall
We started spraying the walls with primer/sealer
finished some french drains
spread 6 yards of mulch around the house to keep mud down
ordered interior doors
gas line installed
Monday, October 8, 2007
Riding Lessons
10/1/07 - Isabelle is loving her riding lessons. She is very good at caring for the horse, doing the tack, or saddling the horse and putting all the gear on, I think that is called tack. Her riding is very good. Megan her instructor, had her doing some exercises that Isabelle had never done and she did it the first time. Her instructor said she never had a student do it the first time. I took some picture and short video slips during this last session. Unfortunately during this session she was trying a new exercise and lost her balance and fell of the horse. She was okay, just got the wind knocked out of her...thank God!
Jacob went to his first Dance. We are so proud of him. He said he had a great time.
Mike




Jacob went to his first Dance. We are so proud of him. He said he had a great time.
Mike





Week 23 (10/1 - 10/7)
Second coat of stucco (brown coat) was applied, looks really good. Drywall was sprayed with preparation coat, and is ready for texture.
Worked on drainage pipes, a little drywall, insulation downstairs, clean up, landscape lighting pipes for the front, installed pipes under driveway.
We went an ordered our wood flooring. Hopefully we will make good progress in October.
MC
Thursday, September 27, 2007
Week 19 - 22 (9/1 - 9/30)
Week 19 - Stucco Lath, Rough Plumbing, HVAC, and Electrical, misc. framing punch list stuff. I ran all of the low voltage communications cabling and tv cabling this weekend.
Week 20 - Fireplace installed, Lath for Stucco completed. Inspections completed with a small list of corrections (20 or so).
Week 21 - Corrections made, Insulation completed. Drywall started. Michele hung insulation on all interior walls, and we rented a trencher and put in french drains and irrigation trenches.




Week 21 - Corrections made, Insulation completed. Drywall started. Michele hung insulation on all interior walls, and we rented a trencher and put in french drains and irrigation trenches.
Week 22 - Drywall (Sheetrock) complete, inspected, stucco scratch coat completed. Tape and texture will start.
Things are going well, Michele is doing a bunch of selection and ordering of kitchen cabinets, appliances, tile, etc. This weekend we should be completing our french drains and irrigation pipes.