Friday, June 1, 2007

Week 5 - Framing

This week the basement area was filled in with rock, sand, wire and the concrete slab was poured. Framing was started on the left side of the house and began on the right side after the slab was poured. This weekend we have to take out a large pine tree that is to close to the back left corner of the house.
MC





Update: Framers made good progress on Friday, so added a few more pictures. Mom and Dad helped take down the trees that needed to be removed on Saturday, and on Sunday I dug some more trenches and Mountain Mike started laying electrical pipe.